Language
NEWS CENTER
Your location:
Homepage
>
>
>
Our company successfully undertook the wind turbine installation project of Shanghai Lingang Offshore Wind Power Phase II

Our company successfully undertook the wind turbine installation project of Shanghai Lingang Offshore Wind Power Phase II

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2016-07-08
  • Views:

(Summary description)Project location: About 1km away from the west side of Donghai Bridge from Lingang New Town, Pudong New District, Shanghai to Yangshan Deepwater Port.

Our company successfully undertook the wind turbine installation project of Shanghai Lingang Offshore Wind Power Phase II

(Summary description)Project location: About 1km away from the west side of Donghai Bridge from Lingang New Town, Pudong New District, Shanghai to Yangshan Deepwater Port.

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2016-07-08 13:47
  • Views:
Information

Project name: Donghai Bridge Offshore Wind Power Phase II Project-Wind Turbine Foundation Civil Construction and Metal Structure Installation Project.

Project location: About 1km away from the west side of Donghai Bridge from Lingang New Town, Pudong New District, Shanghai to Yangshan Deepwater Port.

Project scale: The second phase of the Donghai Bridge offshore wind power project and the Shanghai Donghai Bridge offshore wind power demonstration project have been built across the bridge, and a total of 28 wind turbines in 5 rows are arranged along the north-south direction. The foundation type of the newly-built wind turbine adopts high-pile concrete caps, and each wind turbine is equipped with a foundation. The wind turbine tower and the foundation cap are connected by a transition section tower tube, and the transition section tower tube and the foundation pile are connected by welded steel structure connectors. A flange connection is adopted between the tower tube and the transition section tower tube, a steel structure working platform is set at the elevation, a steel structure ship docking facility and a climbing ladder are set on the outer side of the platform, and collision prevention facilities are set around the platform.

Project cost: The contract price for the foundation civil engineering and metal structure installation of the engineering fan is about 400 million yuan.

Construction time: Since June 2016 till now, our company is under construction.

Our company successfully undertook the wind turbine installation project of Shanghai Lingang Offshore Wind Power Phase II

 

Our company successfully undertook the wind turbine installation project of Shanghai Lingang Offshore Wind Power Phase II

 

Our company successfully undertook the wind turbine installation project of Shanghai Lingang Offshore Wind Power Phase II

 

Our company successfully undertook the wind turbine installation project of Shanghai Lingang Offshore Wind Power Phase II

 

 

Scan the QR code to read on your phone

News

11

2016-07

Overcome difficulties, decisive battle in the first half of the year, fruitful results
Overcome difficulties, decisive battle in the first half of the year, fruitful results
Affected by the economic situation at home and abroad, the steel structure and shipbuilding industry are becoming more and more difficult.
Details 白箭头

08

2016-07

Our company successfully undertook the wind turbine installation project of Shanghai Lingang Offshore Wind Power Phase II
Our company successfully undertook the wind turbine installation project of Shanghai Lingang Offshore Wind Power Phase II
Project location: About 1km away from the west side of Donghai Bridge from Lingang New Town, Pudong New District, Shanghai to Yangshan Deepwater Port.
Details 白箭头

03

2015-11

We thoroughly implement the spirit of the region-wide safety conference and conscientiously do a good job in special management of safety production.
We thoroughly implement the spirit of the region-wide safety conference and conscientiously do a good job in special management of safety production.
On October 30, 2015, the Tongzhou District Construction and Engineering Bureau held an analysis meeting on the safety production situation of construction enterprises in the region and the three action promotion meeting.
Details 白箭头

Service Hotline::

86-513-68916098

Address: Yaosheng Road, Pingchao Town, Tongzhou District, Nantong City, Jiangsu Province

Fax:86-513-68916085

Email:nt@ys-gg.com

Copyright ©  2015 Nantong Yaosheng Steel Co., Ltd.  All rights reserved.     苏ICP备11028791号