Chongqi Bridge Project

PROJECT SHOW

CONTACT US

Tel:86-513-68916098

Fax:86-513-68916085

Email:nt@ys-gg.com

Postcode:226361

Address:Yaosheng Road, Pingchao Town, Tongzhou District, Nantong City, Jiangsu Province

Number of views:
1000

Chongqi Bridge Project

Category:Steel Structure
Project content: fabrication of steel box for bridge pier caps, installation of on-site auxiliary steel structure (offshore cutting piles, box installation, assembly, and removal. Steel box side form and bottom plate are connected by tie rods for the first time, without underwater dismantling technology (technical patent) Certificate), bridge pier template processing (pier body template adopts four-corner rounded upward vase-like streamline design).
Retail price
0.0
Market price
0.0
Number of views:
1000
Product serial number
Hotline: 86-513-68916098
E-mail: nt@ys-gg.com
Quantity
-
+
Stock:
0
Product description
Parameters
Project content: fabrication of steel box for bridge pier caps, installation of on-site auxiliary steel structure (offshore cutting piles, box installation, assembly, and removal. Steel box side form and bottom plate are connected by tie rods for the first time, without underwater dismantling technology (technical patent) Certificate), bridge pier template processing (pier body template adopts four-corner rounded upward vase-like streamline design).
 
Project scale: 1500t steel box processing, 90 sets of offshore steel box installation, 250t template processing. The total project cost is 14.8 million yuan.
 
Commencement and completion date: 2009.4~2010.12.

 

Chongqi Bridge Project

Bridge pier body template assembly drawing

 

Bridge pier body template assembly drawing

Parts of the pier body template

 

Chongqi Bridge Project

The steel box box is processed in the factory and assembled as a whole (to be shipped)

 

The steel box box is processed in the factory and assembled as a whole (to be shipped)

Steel box box is being installed and hoisted on site

 

Steel box box is being installed and hoisted on site

Offshore installation of steel box

 

Offshore installation of steel box

Installation of steel hoop at the bottom of steel box

Keyword:
project
box
steel
template
pier
installation
Scan the QR code to read on your phone
We could not find any corresponding parameters, please add them to the properties table

More works

 Fabrication and Installation of Large Steel Cofferdam for Pier 26 of Zhaohua Bridge, Xiangtan, Hunan
Fabrication and Installation of Large Steel Cofferdam for Pier 26 of Zhaohua Bridge, Xiangtan, Hunan
Fabrication and Installation of Large Steel Cofferdam for Pier 26 of Zhaohua Bridge, Xiangtan, Hunan
 Jiangsu Dongtai Wind Farm Test Pile and High Pile Cap Project Dongtai Offshore Wind Power
Jiangsu Dongtai Wind Farm Test Pile and High Pile Cap Project Dongtai Offshore Wind Power
High pile cap steel box production, transportation, on-site installation (sea piling, box installation), production and installation of ship components, J-tube production and installation.
 Jiangsu Rudong Offshore Wind Power Installation
Jiangsu Rudong Offshore Wind Power Installation
Jiangsu Rudong Offshore Wind Power Installation
 Donghai Bridge Project
Donghai Bridge Project
Fabrication and on-site installation of steel box for the foundation of bridge pier caps (pile cutting at sea, box installation, assembly, and removal).
 Hebei Tangshan Leting Offshore Wind Power Project
Hebei Tangshan Leting Offshore Wind Power Project
Production and transportation of steel box for supporting platform, installation of steel box on site (pile cutting at sea, installation, assembly and removal of box).
 Shanghai Lingang Offshore Wind Power Phase II Project
Shanghai Lingang Offshore Wind Power Phase II Project
Contract content: production and transportation of steel casing for supporting platform, installation of steel casing on site (pile cutting at sea, installation of casing, assembling and dismantling).
 Xiangshui Offshore Wind Power Project
Xiangshui Offshore Wind Power Project
Production and transportation of steel box and jacket for supporting platform. Project scale: 37 sets of steel box processing, 3 sets of jacket processing (steel structure processing volume)
 Hong Kong-Zhuhai-Macao Bridge Island Tunnel Project (East Artificial Island)
Hong Kong-Zhuhai-Macao Bridge Island Tunnel Project (East Artificial Island)
Contract content: offshore erection of steel trestle and steel platform (pile driving, support installation, beam production and installation, Bailey frame assembly and installation, bridge deck installation, railing production and installation);
 Zhijiang Bridge Project of Zhejiang Hangxinjing Expressway Extension
Zhijiang Bridge Project of Zhejiang Hangxinjing Expressway Extension
6. Design and manufacture of large steel caisson for the bearing platform of No. 7 pier, and design and manufacture of special triangular hanging basket for 6-meter span.

Product Inquiry

留言应用名称:
产品留言
描述:

产品留言

验证码

Service Hotline::

86-513-68916098

Address: Yaosheng Road, Pingchao Town, Tongzhou District, Nantong City, Jiangsu Province

Fax:86-513-68916085

Email:nt@ys-gg.com

Copyright ©  2015 Nantong Yaosheng Steel Co., Ltd.  All rights reserved.     苏ICP备11028791号