Hong Kong-Zhuhai-Macao Bridge Island Tunnel Project (East Artificial Island)
Bridge construction trestle erection (beret installation)
Bridge construction trestle erection (column top beam installation)
Bridge construction trestle erection (steel platform piling)
Bridge construction trestle erection (steel platform piling)
Platform hoisting steel pipe piles
Trestle and steel platform railing
(2), contract content: continuous box girder steel support offshore erection (piling, support installation, beam production and installation, Bailey frame assembly installation, bridge deck installation, railing production and installation); project scale: offshore piling 263 pieces, steel structure Installation of 6,400t, steel structure demolition of 5800t, project cost 8.15 million yuan; start and completion date: 2013.11~2015.7.
Box girder steel support for supporting piles
Box girder steel support tie rod installation
Box girder steel support beam system and sandbox structure installation
Box girder steel support Bailey frame system installation
Box girder steel support transverse, longitudinal and scissor support system
Partial renderings of box girder steel support completed
(3). Contract content: manufacturing and installation of steel casing box for pier caps of the bridge section of East Artificial Island (sea cutting piles, casing installation, assembly, and dismantling). Project scale: 6 sets of steel box processing (steel structure 950t), project cost: 9.138 million yuan; start and completion date: 2012.12~2013.9.
Fragment production of steel casing box for caps of bridge section
Assembling drawing of steel case for caps of bridge section in factory
Assembling drawing of steel casing box for caps of bridge section
Sea transportation of steel box for beam caps
(4) Contract content: processing of large formwork trolleys for the anti-wave wall of the east artificial island and the partition wall of the open section of the tunnel. Project scale: 7 sets of processing trolleys, total steel structure processing 240t; project cost 2.57 million yuan; start and completion date: 2014.10~2014.12.
Assembly drawing of the workshop in the trolley factory
On-site construction drawing of wave wall trolley
Trolley construction drawing for the open section of the tunnel entrance
Trolley construction drawing for the open section of the tunnel entrance
More works
Product Inquiry
产品留言
Service Hotline::
Address: Yaosheng Road, Pingchao Town, Tongzhou District, Nantong City, Jiangsu Province