Shanghai Lingang Offshore Wind Power Phase II Project

Category:Steel Structure
Contract content: production and transportation of steel casing for supporting platform, installation of steel casing on site (pile cutting at sea, installation of casing, assembling and dismantling).
Retail price
0.0
Market price
0.0
Number of views:
1000
Product serial number
Hotline: 86-513-68916098
E-mail: nt@ys-gg.com
Quantity
-
+
Stock:
0
Product description
Parameters
Contract content: production and transportation of steel casing for supporting platform, installation of steel casing on site (pile cutting at sea, installation of casing, assembling and dismantling).
 
Project scale: 12 sets of steel box processing, 28 sets of bottom plates, 1720t of steel structure processing, and a project cost of 5.3 million yuan;
 
The start and completion date of the project is 2015.11~2012.5.

 

The start and completion date of the project is 2015.11~2012.5.

Assembled in steel box factory (installation of embedded parts)

 

Assembled in steel box factory (installation of embedded parts)

Steel box box assembly in the factory (installation of bottom plate ventilation pipe)

 

Steel box box assembly in the factory (installation of bottom plate ventilation pipe)

Steel box segment and bottom plate (to be assembled)

 

Steel box segment and bottom plate (to be assembled)

Steel box assembly completed (waiting for shipment)

 

Steel box assembly completed (waiting for shipment)

Offshore steel pipe pile cutting pile (under construction)

 

Offshore steel pipe pile cutting pile (under construction)

Offshore pile cap steel pipe pile (cut pile completed)
 
 
 
(2) Contract content: production and installation of platform connecting pieces, J-tubes, anti-collision steel, ship-being steel, 9.6-meter platform, wind measuring tower for the second-phase offshore wind power project in Lingang; project scale: 28 permanent steel platforms for the platform Production and installation, steel structure engineering volume 3430t, project cost 21.5 million yuan; start and completion date: 2016.3 ~ 2016.12.
 

Offshore pile cap steel pipe pile (cut pile completed)    (2) Contract content: production and installation of platform connecting pieces, J-tubes, anti-collision steel, ship-being steel, 9.6-meter platform, wind measuring tower for the second-phase offshore wind power project in Lingang; project scale: 28 permanent steel platforms for the platform Production and installation, steel structure engineering volume 3430t, project cost 21.5 million yuan; start and completion date: 2016.3 ~ 2016.12.

Welding installation of bearing platform connecting piece

 

Welding installation of bearing platform connecting piece

J-tube, steel hoop, support pile production

 

J-tube, steel hoop, support pile production

Installation of anti-collision piles and 9.6m steel platform

 

(3) Contract content: overall installation of wind turbines for the second phase of Lingang offshore wind power project; project scale: installation of 28 units, project cost of 4.5584 million yuan; start and completion date: 2016.6~2016.12.

 

Shanghai Lingang Offshore Wind Power Phase II Project

Lower hanger of fan

 

Lower hanger of fan

Positioning of the lower part of the machine and positioning of the soft landing system

 

Positioning of the lower part of the machine and positioning of the soft landing system

Temporary platform, positioning frame, positioning buffer system under the fan

 

Temporary platform, positioning frame, positioning buffer system under the fan

The fan is installed and buffered accurately in place

 

The fan is installed and buffered accurately in place

The fan is being installed

 

The fan is being installed

The complete installation of the fan is completed

Keyword:
phase
steel
installation
project
pile
platform
Scan the QR code to read on your phone
We could not find any corresponding parameters, please add them to the properties table

More works

 Fabrication and Installation of Large Steel Cofferdam for Pier 26 of Zhaohua Bridge, Xiangtan, Hunan
Fabrication and Installation of Large Steel Cofferdam for Pier 26 of Zhaohua Bridge, Xiangtan, Hunan
Fabrication and Installation of Large Steel Cofferdam for Pier 26 of Zhaohua Bridge, Xiangtan, Hunan
 Jiangsu Dongtai Wind Farm Test Pile and High Pile Cap Project Dongtai Offshore Wind Power
Jiangsu Dongtai Wind Farm Test Pile and High Pile Cap Project Dongtai Offshore Wind Power
High pile cap steel box production, transportation, on-site installation (sea piling, box installation), production and installation of ship components, J-tube production and installation.
 Jiangsu Rudong Offshore Wind Power Installation
Jiangsu Rudong Offshore Wind Power Installation
Jiangsu Rudong Offshore Wind Power Installation
 Donghai Bridge Project
Donghai Bridge Project
Fabrication and on-site installation of steel box for the foundation of bridge pier caps (pile cutting at sea, box installation, assembly, and removal).
 Hebei Tangshan Leting Offshore Wind Power Project
Hebei Tangshan Leting Offshore Wind Power Project
Production and transportation of steel box for supporting platform, installation of steel box on site (pile cutting at sea, installation, assembly and removal of box).
 Shanghai Lingang Offshore Wind Power Phase II Project
Shanghai Lingang Offshore Wind Power Phase II Project
Contract content: production and transportation of steel casing for supporting platform, installation of steel casing on site (pile cutting at sea, installation of casing, assembling and dismantling).
 Xiangshui Offshore Wind Power Project
Xiangshui Offshore Wind Power Project
Production and transportation of steel box and jacket for supporting platform. Project scale: 37 sets of steel box processing, 3 sets of jacket processing (steel structure processing volume)
 Hong Kong-Zhuhai-Macao Bridge Island Tunnel Project (East Artificial Island)
Hong Kong-Zhuhai-Macao Bridge Island Tunnel Project (East Artificial Island)
Contract content: offshore erection of steel trestle and steel platform (pile driving, support installation, beam production and installation, Bailey frame assembly and installation, bridge deck installation, railing production and installation);
 Zhijiang Bridge Project of Zhejiang Hangxinjing Expressway Extension
Zhijiang Bridge Project of Zhejiang Hangxinjing Expressway Extension
6. Design and manufacture of large steel caisson for the bearing platform of No. 7 pier, and design and manufacture of special triangular hanging basket for 6-meter span.

Product Inquiry

留言应用名称:
产品留言
描述:

产品留言

验证码

Service Hotline::

86-513-68916098

Address: Yaosheng Road, Pingchao Town, Tongzhou District, Nantong City, Jiangsu Province

Fax:86-513-68916085

Email:nt@ys-gg.com

Copyright ©  2015 Nantong Yaosheng Steel Co., Ltd.  All rights reserved.     苏ICP备11028791号