Language
NEWS CENTER
Your location:
Homepage
>
>
>
Repair of steel bridges is a worldwide problem

Repair of steel bridges is a worldwide problem

  • Categories:Industry News
  • Author:
  • Origin:
  • Time of issue:2021-05-29
  • Views:

(Summary description)Dr. Thiele is a professor at the University of Kassel in Germany. He has more than 40 years of experience in steel structure and bridge dynamics research, mainly engaged in steel structure design and bridge dynamics research. Participated in the wind design of the Nuncan Bridge.

Repair of steel bridges is a worldwide problem

(Summary description)Dr. Thiele is a professor at the University of Kassel in Germany. He has more than 40 years of experience in steel structure and bridge dynamics research, mainly engaged in steel structure design and bridge dynamics research. Participated in the wind design of the Nuncan Bridge.

  • Categories:Industry News
  • Author:
  • Origin:
  • Time of issue:2021-05-29 13:20
  • Views:
Information

Dr. Thiele is a professor at the University of Kassel in Germany. He has more than 40 years of experience in steel structure and bridge dynamics research, mainly engaged in steel structure design and bridge dynamics research. Participated in the wind design of the Nuncan Bridge. This is the first time in the world that shock absorbing dampers have been used on stay cables. Professor Thiele studied under Professor K.Kloeppel from Technische Hochshule Darmstadt, Germany. Professor Li Guohao, the former president of Tongji University and a famous bridge master in China, is a classmate before and after.

In an interview, Dr. Thiele said that in the 1940s, in Germany after World War II, many bridges were damaged and needed to be repaired and replaced. But today, decades later, bridge maintenance has become a worldwide problem. Due to the large-scale construction of bridges in the past few decades, all countries with orthotropic plate steel bridges are faced with the cost of necessary repairs and maintenance of the bridges. But we are not sure which is the best repair method. Because thousands of vehicles pass by the bridge every day, it is impossible to interrupt the traffic on the bridge. Bridge repairs can only be carried out under the premise of ensuring traffic operation.

In the construction of steel bridges, the management of welding quality is very important. The quality of welding depends on the efficiency of the welder. You can't judge the quality of a welder from the surface, all you can do is to check it every week. The welder can be tested and told to ensure the quality. If he can’t, he won’t be able to get the money, so that the welding quality can be continuously improved. Therefore, inspection is a necessary way to ensure quality.

Sometimes, the welding surface may be perfect, but I don’t know what it looks like inside. Maybe there are big problems hidden under the smooth surface. The only opportunity to make up is to test, open the welding surface, check all aspects, and correct any problems immediately.

Dr. Thiele said that sometimes the bridge has some cracks, but it does not affect the operation. In Kassel, Germany, he once investigated some bridges. The result is amazing. Many bridges have cracks, but the bridge itself is still good, so he suggested not to rush to repair it immediately. Perhaps these bridges can continue to exist for many years, and they can be kept as they are before the construction of new bridges. Don't fix it immediately, you can wait 10 years to see, but don't wait 50 years.

Dr. Thiele is a very cute gentleman, although he is in his seventies, he is still energetic, full of spirit, and will be humorous from time to time. When the reporter asked him if he likes football, Dr. Thiele shrugged and said solemnly: "I like my wife".

Scan the QR code to read on your phone

News

11

2016-07

Overcome difficulties, decisive battle in the first half of the year, fruitful results
Overcome difficulties, decisive battle in the first half of the year, fruitful results
Affected by the economic situation at home and abroad, the steel structure and shipbuilding industry are becoming more and more difficult.
Details 白箭头

08

2016-07

Our company successfully undertook the wind turbine installation project of Shanghai Lingang Offshore Wind Power Phase II
Our company successfully undertook the wind turbine installation project of Shanghai Lingang Offshore Wind Power Phase II
Project location: About 1km away from the west side of Donghai Bridge from Lingang New Town, Pudong New District, Shanghai to Yangshan Deepwater Port.
Details 白箭头

03

2015-11

We thoroughly implement the spirit of the region-wide safety conference and conscientiously do a good job in special management of safety production.
We thoroughly implement the spirit of the region-wide safety conference and conscientiously do a good job in special management of safety production.
On October 30, 2015, the Tongzhou District Construction and Engineering Bureau held an analysis meeting on the safety production situation of construction enterprises in the region and the three action promotion meeting.
Details 白箭头

Service Hotline::

86-513-68916098

Address: Yaosheng Road, Pingchao Town, Tongzhou District, Nantong City, Jiangsu Province

Fax:86-513-68916085

Email:nt@ys-gg.com

Copyright ©  2015 Nantong Yaosheng Steel Co., Ltd.  All rights reserved.     苏ICP备11028791号